METRIK MFG
Inspection Report Template
A practical dimensional inspection report template for first-piece, in-process and final inspection records.
This form is a practical starting template. Customer-specific FAI packages, inspection plans and quality-system procedures take precedence.
Header
| Part | ____________ | Revision | ____________ |
|---|---|---|---|
| Job | ____________ | Inspection | First / In-process / Final |
| Inspector | ____________ | Date | ____________ |
Dimensional results
| Characteristic | Nominal | Upper | Lower | Measured | Gage / method | Pass / fail |
|---|---|---|---|---|---|---|
| 1 | ____ | ____ | ____ | ____ | ____ | ____ |
| 2 | ____ | ____ | ____ | ____ | ____ | ____ |
| 3 | ____ | ____ | ____ | ____ | ____ | ____ |
Quality note
The measurement method must suit the tolerance and feature. Instrument resolution, calibration, fixturing and datum setup can affect results. Geometric controls should be interpreted from the drawing and applicable GD&T standard rather than reduced to a simple plus/minus check.
Reference: ASME Y14.5.
| Report a correction Suggest a missing field. |
Request a resource Ask for an FAI/GD&T form. |